BidTroller/User guide

Past jobs

If your company has workflow turned on, Past jobs in the top menu (/app/past-jobs) is where you show BidTroller jobs you have already bid, and see how close its takeoff comes to your estimator's.

Adding a past job

  1. Open Past jobs, type the job's name (and a note if you like, e.g. Won, bid 2025) and press Add past job.
  2. On the job's page, under Add files, pick the files from your computer. For each file, say what it is: - Plans and specs (as bid) - Estimator's takeoff (Bluebeam PDF): the PDF with the estimator's length measurements on it, saved from Bluebeam, not printed or flattened - Scope letter or bid - Other
  3. Press Upload. Files go straight from your computer to BidTroller's private storage, up to 200 MB each. Nothing is read from your Google Drive.

Owners, admins and estimators add and delete past jobs. Everyone at your company can see them.

Compare

Press Compare on a job once its estimator's takeoff is uploaded. BidTroller:

  • reads the estimator's Bluebeam length measurements and what each was called (Fence, Gate, and so on);
  • takes every measurement and the estimator's scale calibration off the sheets, so it can't see the answer;
  • measures the sheets the estimator measured (the three with the most footage per file, two takeoff files per job), the same way it measures a job's plans;
  • shows both side by side: total fence, gates, and sheet by sheet the estimator's measurements next to BidTroller's fence types.

It takes a minute or two. The difference is BidTroller's new fence (alternates left out) against everything the estimator measured that isn't a gate. Each of the estimator's measurements is grouped by its name and colour. A group counts as gate openings, one per line, when its name says gate, or when every line in it is short (60 ft at most, 40 ft on average) beside longer runs on the same sheet, because many estimators mark gates in their own colour and still call them Fence. If BidTroller got a group wrong, press Count as fence or Count as gates next to it: the totals change straight away, without measuring again.

Fence drawn on two of the compared sheets (an overall plan and an enlarged plan) is counted once, on the more detailed sheet, the same as on a job's takeoff. The sheet where it isn't counted says so. Press Compare again after uploading another takeoff, or after BidTroller's takeoff improves.

A comparison doesn't use a takeoff credit.

How long files are kept, and deleting

Past jobs and their files stay until someone at your company deletes them. Delete next to a file deletes that file; Delete this past job at the bottom of a job's page deletes the job and every file in it. Deleted files are gone from BidTroller.

How BidTroller uses them

The comparison is for you. BidTroller uses your past jobs to test and improve its takeoff only with your company's written OK, and never shares them with another company.

If your company has given that OK, the top of the Past jobs page says so, with the date. BidTroller staff then use the jobs you upload (and any you send us another way) to check and improve how it measures fence and gates. The files stay in your account. To withdraw the OK, write to us: staff record it, and past jobs you upload after that are used only for your own comparisons.